View Single Post
  #9  
Old 11-15-2004, 06:40 PM
m0oni9
Hill Giant
 
Join Date: Dec 2003
Posts: 166
Default

Quote:
Originally Posted by animepimp
To automatically set paths between nodes you could use the existing LOS and distance calculation methods as the node is created.
If a path should only go from A<-->B<-->C (ie: no connection between A and C), and all points have LOS to each other, how will the server know that the A<-->C connection is not valid?

Would you be able to restate the other paragraphs, or create something visually? Maybe I am just dense, but I am a little lost with them.
Reply With Quote